Repair works to Dubbo Gully Bridge are programmed for 17 to 29 October 2016.
These works will restore the load rating of the bridge to 20 tonnes (removing the current 3 tonne load restriction).
While the bridge is being repaired it will not be passable by any traffic (vehicular or pedestrian).
Signage advising of the temporary closure will be placed at the Dubbo Gully gate.